Adopting GovWren

This guide is for whoever is bringing GovWren into an organization: usually the person who leads AI governance, working with whoever runs the server.

It is a plan, not a manual. It says what to decide, in what order, and what to leave for later, from the first conversation to the first attestation campaign. Each step points to the guide that says how.

Plan for eight to twelve weeks from a decision to adopt to a completed first campaign. Very little of that time is spent on the software. The timings here are a plan to start from, not a record of what others took.

Before you install anything#

Four things decide how the rest goes. Settle them first, on paper.

Who owns the program#

Name one person who is answerable for AI governance, and one who stands in for them. GovWren will ask for this in the first hour, as the people who hold the governance role.

If nobody owns it yet, stop here. GovWren records decisions. It cannot make an organization want to make them.

What the units are#

GovWren is built for organizations where labs, departments, and centers decide a good deal for themselves. Every record belongs to a unit, and stewards answer for a unit's list.

Write down your units as a tree: the organization, its divisions or schools, the departments, and the labs or groups beneath them.

Who reviews what#

GovWren routes a request to review functions by rule: privacy, security, legal, ethics, research integrity, clinical safety, data stewardship, and architecture. Few organizations need all eight; four or five is usual.

For each function you will use, name one or two people. They do not need to be new roles. The privacy officer is already the privacy reviewer.

Decide also who decides. In the default program, governance decides moderate requests, a committee decides high ones, and the highest tier needs a named person to accept the risk. If you have a committee, find out when it meets: its calendar sets the pace of your slowest decisions.

What you already know#

You are not starting from nothing. Somewhere there is a spreadsheet of tools people have asked about, a list of vendors with agreements, and a memo saying which tools are allowed.

Collect them. They become your catalog and your first records, and bringing them in is how you find out what your policy actually is.

Weeks 1 and 2: stand it up#

The aim of these two weeks is an installation that the core team can sign in to, with your name on it and your structure in it. Nobody outside the core team needs to know it exists yet.

StepWhoHow
Try the demo for an hour, signed in as each sample person in turnEveryone on the core teamExplore the demo organization
Choose where it will runWhoever runs the serverDeployment
Install, starting from the program closest to yoursWhoever runs the serverBegin from a starter
Connect single sign-onWhoever runs the serverSingle sign-on
Set up emailWhoever runs the serverEmail
Make it yours: name, logo, colors, your own wordsAn administratorSet the appearance
Bring in units and peopleAn administratorImport units and people from CSV
Give out the rolesAn administratorRoles and scopes
Schedule a backup, and restore one onceWhoever runs the serverOperations
Run govwren doctor --production until nothing is left that you have not decided aboutWhoever runs the serverCheck before people depend on it

Three things are worth doing properly now, because they are tedious to change later:

Weeks 2 to 4: make the program yours#

The starter program works on the first day. It is not yours until the people who will live with it have read it.

Sit the core team down with the Program page for two hours and go through it in this order:

  1. The data classes. These are the most important four lines in the installation. Use your organization's own classification, with its own names and examples. People pick the right class only when they recognize their own data in it. See The data classes.
  2. The request form. Read every question aloud. Cut any whose answer would never change a decision. Requesters forgive a form that is short.
  3. The tiers. Take five real uses you already know about, some trivial and some serious, and run them through the preview. If the tier surprises you, change the scoring until it does not. See How a request gets its tier.
  4. The routing rules. For each tier, check who reviews, who decides, how long they have, and how long an approval lasts. The low tier should be approved by rule, the same day. That is what makes the front door a door.
  5. The standard conditions. These are the sentences every approved use will carry. Make them ones you would be willing to enforce.

Then build the catalog. Enter the tools you have already decided about, each with its standing and the most sensitive class of data it may be used with. See Build the catalog.

A good catalog is the single thing that most decides whether people use GovWren. If the ten tools people actually use are there, with a clear answer, most people get what they came for in a minute and register their use in another.

Bring in what you already have: import from a spreadsheet, with a dry run first.

Leave these for later. None of them is needed to open:

Weeks 4 to 6: a pilot with two units#

Choose two units to go first: one that is keen, and one that is typical. Not the most skeptical one. That comes later, when you have something to show.

Ask each to do three things, with you in the room the first time:

  1. Look up the tools they use in the catalog, and register each use.
  2. Make one real request for something that is not in the catalog.
  3. Have their steward look at the unit's list and say what is missing.

Watch where they stop. Every hesitation is a question to reword, a class to explain better, or a tool to add to the catalog.

Run the requests through for real. Reviewers review, governance decides, conditions are set. This is the reviewers' practice as much as the requesters'.

At the end of the pilot, look at three numbers on the Measures page:

MeasureWhat you want to see
TurnaroundDays, not weeks, for anything below the high tier
ThroughputMost requests approved by rule
CompletenessThe pilot units' records mostly whole

If turnaround is long, find out where the time went before you open the door wider. The review of a request shows how long it sat with each person.

Weeks 6 to 8: open the door#

Now tell everyone. The message is short:

Put the address where people already look: the intranet's front page, the research office's pages, the new-starter checklist. Put your policy and your help address in GovWren's links, so that the path runs both ways.

Connect the places where a reference should be asked for. A purchasing form, an ethics application, or a data access request that asks "what is the GovWren reference?" does more for coverage than any announcement. The receiving system can check the reference itself: see The checkpoint.

Expect a rush in the first two weeks, mostly registrations of tools already in the catalog. That is the inventory filling up. It is the point.

Hold a short session for stewards. They need to know three things: their unit's list is theirs, My unit shows it on one page, and they will soon be asked to say it is complete.

Weeks 8 to 12: the first campaign#

An inventory nobody has confirmed is a list of what people remembered to tell you. The first attestation campaign turns it into something you can stand behind.

Run a unit completeness campaign first. Each steward looks at their unit's list, adds what is missing, and attests that it is complete. See Attestation campaigns.

When it closes, you know what you have, by unit, with a name against each list. Make your first report to leadership on that day. It is the baseline every later report is read against.

After the first quarter#

By now GovWren is doing a good deal by itself: opening periodic reviews before approvals end, reminding owners, marking approvals that nobody renewed. See What GovWren does by itself.

What to add, in a sensible order:

WhenAddWhy
Month 4An owner confirmation campaignEach owner confirms that their use is still as described
Month 4Incident reporting, announcedPeople need to know where to say something went wrong
Month 6The control library, with owners and evidence for the program's own controlsSo that you can show the program works, not only that it exists
Month 6A quarterly report, made on the same day each quarterLeadership learns to expect it
When askedA frameworkOnly when an auditor, a funder, or a regulator asks how you answer one
When readyThe transparency registerWhen you are prepared to say in public how you use AI

What goes wrong, and what to do#

What you seeWhat it usually meansWhat to do
Few requests, and people still asking by emailThe catalog does not hold the tools they useAdd the ten tools people actually use, with clear answers
Requests arrive but sit for weeksA review function has one person, who is away, or a committee that meets monthlyName a second reviewer. Lower the tier at which the committee is needed
Everything comes out high tierThe scoring counts something common as seriousRun past requests through the preview and adjust
Stewards do not attestThey were not told the list was theirsTalk to them. Show them My unit
Approvals lapse in numbersOwners ignore the reminder, or have leftCheck that email is working, and that records have a second owner
Units keep their own spreadsheetGovWren is missing something they need to recordAsk what. Often it is one field of their own

What GovWren will not do#

It helps to say this early, to yourself and to leadership.